Skip to content
Touch-Base
Introduction
  • What UPDD is
  • Touch hardware and device notes
  • Downloading UPDD
Licensing
  • Licensing overview
  • Registering UPDD
  • Releasing and moving a licence
  • Registration problems
Windows
  • Install UPDD on Windows
  • Uninstall UPDD on Windows
  • What UPDD installs on Windows
  • Multi-monitor on Windows
macOS
  • Install UPDD on macOS
  • Uninstall UPDD on macOS
  • What UPDD installs on macOS
  • Allowing the driver extension
  • macOS permissions
  • macOS usage notes
Linux
  • Install UPDD on Linux
  • Uninstall UPDD on Linux
  • What UPDD installs on Linux
  • Linux touch delivery: uinput and X
  • Multi-monitor on Linux
  • Linux distributions
Using the driver
  • UPDD Console
  • UPDD Daemon (tray and menu bar)
  • Calibration
  • Monitors
  • Click behaviour
  • Disabling and prioritising touch
  • Cursor, anchor mouse and sound
  • Toolbars
  • Virtual devices
  • Sleep, wake and touch after resume
  • Language support
  • UPDD Test
  • UPDD Annotate
  • Reinstalling and upgrading UPDD
Settings and command line
  • How UPDD settings work
  • Driver settings reference
  • Touch data filtering
  • upddutils command line reference
Hardware
  • Hardware interfaces: USB, HID and I2C
  • Serial (RS232) devices
  • EEPROM and firmware
  • Watchdog and recovery script (UPDD 6)
UPDD Commander
  • What UPDD Commander is
  • Running Commander
  • Commander settings reference
  • Gestures and actions
  • Modifiers
  • Applications, groups and UI elements
  • Presets
  • Clickable UI element (click nearest)
  • Smart Magnifier
  • Screen zoom
  • On-screen keyboard
  • Pen and pressure
  • Scroll behaviour
  • Window actions
  • Single-purpose touch screens
  • TUIO
  • TUIO in Commander
  • Browser TUIO bridge extension
  • Applications
  • Browsers
  • Dock, Notification Centre and widgets
  • DAW applications
  • Unity and games
  • iOS Simulator
  • Notes on other applications
  • Troubleshooting
  • Diagnosing gesture selection
  • Touch delay and latency
  • Problems on macOS
Troubleshooting
  • Touch not working: first steps
  • Taking a diagnostics package
  • What is in a diagnostics package
  • Logs and driver debugging
  • Identifying a touch device
  • Crash logs and dumps
  • Remote access
  • USB and devices
  • USB connection problems
  • USB initialisation settings and stalls
  • Capturing USB or serial traffic
  • Known hardware issues
  • Stuck in single-touch mode
  • Delay before touch is active
  • Touch on the wrong screen, or none
  • Specialist builds
  • macOS
  • Installation problems on macOS
  • Device not responding
  • macOS: UPDD processes not running
  • macOS: /usr/local permissions
  • Windows
  • Installation problems on Windows
  • Virtual device problems
  • Windows helper notes
  • macOS mouse emulation debug tool
Programming
  • UPDD API overview
  • Adding multi-touch to an application
  • Connecting and receiving events
  • API event reference
  • Settings API
  • Device control from the API
  • API example programs
  • Building API clients on macOS
  • Qt applications: the UPDDTouch plugin
  • UPDDMultitouch framework
  • JUCE applications and plug-ins
  • API apps with Commander
  • API changes from UPDD 6 to UPDD 7
  • Debug symbols

Licence and notices

Development History
  • Development History
  • Driver
  • Commander

Flexi-Deck

Knowledge base
  • Operating System
  • Android
  • UPDD for Android (UPDD 6)
  • Drivers
  • Mac OS
  • WINE - Windows application support
  • Operating System
  • Linux
  • Linux source option
  • HID driver blocking a device
  • Mac OS
  • Dragging windows across screens

UPDD V7 delay analysis before touch is active

This page has moved to /topic/touch-delay-at-start.

touch-base.com · Contact